日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费

中文
News
News
News and information

Home > News > News Information

Nine design cores of precision metal stamping molds
Time : 2023-05-26 Click count : 2452

1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
亚洲www永久成人夜色| 欧美日韩第二页| 韩日精品中文字幕| 国产精品久久国产| 国产日产欧美a一级在线| 欧美精品电影在线| 91精品国产色综合久久不卡98| 午夜精品久久久久久久久久久久久 | 日韩在线一区二区三区免费视频| 欧美一级片在线播放| 色偷偷91综合久久噜噜| 黄色片网址在线观看| 精品中文字幕在线2019| 99国产在线视频| 日本久久久网站| 久久久久久香蕉| 黄色大片在线免费看| 国产精品国产三级国产aⅴ9色| 国产日韩一区二区| 亚洲第一综合网站| 日韩视频在线免费观看| 国产欧美一区二区三区在线看| 亚洲欧美日韩精品久久久| 久久免费看av| 免费毛片网站在线观看| 亚洲日本无吗高清不卡| 日韩中文字幕网站| 国模吧无码一区二区三区| 久热精品在线视频| 99在线免费观看视频| 精品免费日产一区一区三区免费| 日韩中文字幕在线视频| 国产美女在线精品免费观看| 日韩av免费电影| 久久伊人精品天天| 久久久免费观看视频| 精品一区二区不卡| 懂色中文一区二区三区在线视频| 日韩亚洲精品视频| 成人a级免费视频| 欧美中文字幕在线观看| 中文字幕日本最新乱码视频| 日韩亚洲欧美中文在线| 成人免费无码av| 欧美在线观看一区二区三区| 欧美成人中文字幕| 久久久久久久免费视频| 久久久免费看| 日日噜噜噜夜夜爽爽| 8090成年在线看片午夜| 日韩久久久久久久| 日韩精品久久一区二区| 国产精品视频26uuu| 91国偷自产一区二区三区的观看方式 | 久久99精品久久久水蜜桃| 国产伦理久久久| 欧美亚洲另类激情另类| 亚洲精品影院| 国产精品视频26uuu| 国产福利久久精品| 成人av在线播放观看| 国产一区二区三区小说| 欧美激情专区| 日本91av在线播放| 亚洲mm色国产网站| 欧美激情亚洲精品| 久久国产一区二区三区| 久久理论片午夜琪琪电影网| 成人在线国产精品| 国产亚洲天堂网| 欧美 日韩 国产在线| 奇米影视亚洲狠狠色| 天堂а√在线中文在线| 一本大道熟女人妻中文字幕在线 | 久久久精品国产一区二区| 国产成人短视频| 久久人人爽国产| 久久久亚洲国产天美传媒修理工| 成人免费午夜电影| 国产三级中文字幕| 国产自产女人91一区在线观看| 欧美亚州一区二区三区| 日韩精品一区二区三区久久 | 久久免费一区| 国产精品9999| 7777奇米亚洲综合久久| 不卡一卡2卡3卡4卡精品在| 国产精品亚洲美女av网站| 国产精品一久久香蕉国产线看观看| 国产日韩在线一区二区三区| 国产一级大片免费看| 国产男女激情视频| 高清欧美性猛交xxxx| 国产区日韩欧美| 国产伦精品一区二区三区免| 国产乱子夫妻xx黑人xyx真爽| 国产日韩一区二区| 国产精品一区二区三区久久久| 国产美女搞久久| 国产精品夜间视频香蕉| 国产精品一区二区久久久| 成人免费网视频| 91久久久精品| 久久久综合亚洲91久久98| 久久av喷吹av高潮av| 久久精品国产2020观看福利| 国产精品久久久久9999小说| 国产精品成久久久久三级| 国产精品海角社区在线观看| 美女福利视频一区| 亚洲视频精品一区| 色中色综合成人| 日韩av在线播放不卡| 日韩免费在线播放| 免费中文日韩| 国产日韩亚洲精品| 91精品在线看| 深夜福利国产精品| 国产精品久久久久久久久久久久午夜片 | 日韩精品久久一区二区三区| 欧美一区二区视频在线播放| 蜜桃传媒一区二区三区 | 国产aⅴ精品一区二区三区黄| 亚洲高潮无码久久| 日韩视频专区| 国内精品久久久久影院优| 高清国产一区| 九九九热999| 精品国产一区三区| 亚洲第一精品区| 欧洲久久久久久| 国产欧美日韩精品丝袜高跟鞋 | 亚洲精品一区二区三| 日韩日韩日韩日韩日韩| 精品少妇人欧美激情在线观看| 丰满少妇久久久| 久久久久久久久影视| 欧美精品一区三区| 日韩不卡av| 国产欧美最新羞羞视频在线观看| 久久久女女女女999久久| 国产精品视频中文字幕91| 亚洲天堂电影网| 欧美精品123| 97久久国产亚洲精品超碰热| 国产精品免费看久久久无码| 一本色道久久综合亚洲二区三区| 欧美一区视频在线| 成人久久18免费网站漫画| 久久久精品久久久久| 久久91亚洲精品中文字幕奶水| 日韩一级片一区二区| 免费看日b视频| 久久精品国产美女| 伊人久久大香线蕉午夜av| 日韩精品极品视频在线观看免费| 国产精品综合不卡av| 久久精品视频在线| 无码日韩人妻精品久久蜜桃| 国产又粗又猛又爽又黄的网站| 国产福利不卡| 伊人久久大香线蕉精品| 精品免费一区二区三区蜜桃| 国产精品 欧美在线| 精品丰满人妻无套内射| 欧美亚洲国产另类| 99在线影院| 两个人的视频www国产精品| 青青草综合在线| 国产经典一区二区| 欧美精品激情视频| 黄色a级片免费看| 久久久久免费网| 视频在线精品一区| 97精品视频在线| 久久91精品国产91久久久| 欧美国产视频一区| 久久久久久久久久久91| 天堂√在线观看一区二区| 99在线视频播放| 九色精品美女在线| 欧美日本韩国在线| 久久久久久九九| 日批视频在线免费看| 91精品国产自产在线观看永久 | 免费国产成人看片在线| 色妞色视频一区二区三区四区| 午夜精品久久久内射近拍高清| 成人美女免费网站视频| 欧美激情视频一区二区三区不卡| 韩国精品久久久999| 国产成人免费观看| 日本视频一区在线观看| 91成人精品网站| 亚洲黄色一区二区三区| 99色这里只有精品| 一区二区精品免费视频| 国产乱码精品一区二区三区不卡 | 日韩有码在线观看| 日韩激情久久|