Nine design cores of precision metal stamping molds
Time : 2023-05-26 Click count : 2247

1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
久草视频这里只有精品| 欧美一区二区视频97| 97久草视频| 国产日韩欧美夫妻视频在线观看| 欧美亚州一区二区三区| 欧美一区免费视频| 黄色99视频| 国产男人精品视频| av网址在线观看免费| 91av一区二区三区| 国产不卡视频在线| 国产成人精品亚洲精品| 国产精品第七影院| 欧美精品999| 少妇人妻在线视频| 欧美尤物巨大精品爽| 欧美精品一区二区三区三州| 蜜桃免费区二区三区| 毛葺葺老太做受视频| 国产伦精品免费视频| 97精品一区二区视频在线观看 | 国产欧美日韩精品丝袜高跟鞋| 国产亚洲综合视频| 99在线看视频| 色妞在线综合亚洲欧美| 国产精品高清在线观看| 在线视频一区观看| 日本成人黄色免费看| 欧美牲交a欧美牲交aⅴ免费真| 精品一区在线播放| 99在线高清视频在线播放| 99精品国产高清在线观看| 国产福利视频一区| 久久亚洲国产精品| 无码aⅴ精品一区二区三区浪潮| 日本wwwcom| 国产伦精品一区二区三区免 | 国产色婷婷国产综合在线理论片a| 国产九九精品视频| 国产成人一区三区| 久久精品视频亚洲| 九色精品美女在线| 日韩激情视频一区二区| 国产日韩视频在线播放| 久久国产色av免费观看| 久99久在线视频| 日韩精品一区二区三区色欲av| 国产男女无遮挡| 日韩中文字幕在线视频| 亚洲综合中文字幕在线| 欧美日韩一区二区三区电影| 99视频在线免费| 国产精品久久久久久久久久ktv| 污污污污污污www网站免费| 国产一区二区色| 精品久久久av| 亚洲色图自拍| 国产在线观看一区二区三区| 久久久久久久午夜| 亚洲丰满在线| 国产视频精品网| 国产精品日韩欧美综合| 婷婷精品国产一区二区三区日韩| 精品一区2区三区| 色老头一区二区三区在线观看| 欧美激情xxxx| 国产中文字幕二区| 日韩少妇与小伙激情| 日本欧美中文字幕| 97精品一区二区三区| 欧美日韩第一视频| 青青在线视频一区二区三区| 久久精品午夜一区二区福利| 亚洲一卡二卡| 国产精品自拍偷拍视频| 久久婷婷国产麻豆91天堂| 欧美精品无码一区二区三区| 久久久久免费看黄a片app| 婷婷久久五月天| 91精品久久久久久久久久另类 | 99在线国产| 精品国产三级a∨在线| 欧美综合在线观看| 国产精品50p| 无码中文字幕色专区| 成人乱人伦精品视频在线观看| 色综合视频网站| 国产在线精品自拍| 国产精品久久久久久久久借妻| 欧美激情国产日韩| 久久九九全国免费精品观看| 欧美亚洲成人精品| 国产精品热视频| 国内精品一区二区三区| 国产精品区一区二区三含羞草| 黄色特一级视频| 国产精品麻豆va在线播放| 欧美 日韩 国产 高清| 国产精品丝袜高跟| 欧美一区亚洲二区| 国产精品久久久对白| 国产日韩欧美成人| 欧美激情区在线播放| 99久久精品免费看国产一区二区三区 | 最新国产精品久久| 国产九色porny| 亚洲欧洲精品一区二区| 久久久久福利视频| 欧美日韩dvd| 蜜臀久久99精品久久久无需会员 | 中文字幕av日韩精品| 粉嫩av一区二区三区免费观看 | 国产精品久久久对白| 麻豆精品蜜桃一区二区三区| 久久综合久中文字幕青草| 美女日批免费视频| 欧美区在线播放| 久久久91精品| 免费看欧美一级片| 一区二区成人国产精品| 国产有码在线一区二区视频| 久久亚洲精品视频| 国产视频一区二区三区四区| 亚洲精品一区国产精品| 日韩中文理论片| 国产亚洲福利社区| 亚洲乱码中文字幕久久孕妇黑人| 久久黄色免费看| 国产日韩欧美二区| 欧美一级免费视频| 国产精品久久久久999| 成人免费网视频| 日韩av中文字幕第一页| 国产精品精品视频| 久久免费视频这里只有精品| 欧美在线视频a| 8050国产精品久久久久久| 热久久免费国产视频| 久久久久久18| 国产精品日韩三级| 91精品在线影院| 精品一区二区成人免费视频| 动漫一区二区在线| 久久综合网hezyo| 久久久久久久久综合| 国产精品一区二区免费| 欧美亚洲视频在线看网址| 亚洲欧洲久久| 久久香蕉国产线看观看网| 久久精品国产第一区二区三区最新章节 | 蜜臀av无码一区二区三区| 无码人妻精品一区二区蜜桃网站| 国产精品久久综合av爱欲tv| 久久视频在线观看中文字幕| 国产精品专区一| 欧美日韩一区二区在线免费观看| 偷拍视频一区二区| 制服诱惑一区| 国产精品久久久久久久久久| 久久久久久久av| 久久久欧美一区二区| 国产乱码一区| 精品视频在线观看| 热久久精品国产| 日韩免费观看网站| 日本亚洲欧洲色α| 性一交一乱一伧国产女士spa| 精品产品国产在线不卡| 国产精品久久久久久久久久东京| 久草一区二区| 久久精品日产第一区二区三区精品版 | 日韩在线视频播放| 国产成人精品免高潮在线观看| 高清一区二区三区四区五区| 欧美日韩亚洲综合一区二区三区激情在线| 亚洲一区二区在线播放| 久热精品视频在线免费观看| 国产精品美腿一区在线看 | 黄色大片在线免费看| 青青在线视频免费| 人人妻人人澡人人爽欧美一区双| 少妇免费毛片久久久久久久久| 亚洲最大av网站| 亚洲欧美综合一区| 亚洲区一区二区三区| 中文一区一区三区免费| 精品国产av无码一区二区三区| 国产精品高潮呻吟久久av无限| 久久久国产精彩视频美女艺术照福利| 久久久久久久久久久国产| 久久av一区二区| 久久久久久久国产精品| www.日韩系列| 久久久久久久久久久久久久国产 | 国产精品专区第二| 国产精品一区二区三区免费| 精品欧美日韩| 国产在线xxxx| 成人在线精品视频| 久久综合福利|